Major renovation of turnkey cottages. Expensive turnkey apartment renovation

And today we will talk about a major renovation of the apartment. Carrying out major repairs is a responsible and important task, which is preferable to entrust to professionals. From our article you will learn everything about organizing a major overhaul; we will list the procedure for carrying out a major overhaul and will guide you through the sequence of necessary work.

Before we begin to describe all types of construction work carried out during a major overhaul, it is necessary to understand what this concept includes and how a major overhaul differs from a current one. Its most comprehensive and comprehensive definition is contained in the federal law “On the Fund for Assistance to the Reform of Housing and Communal Services” (FZ-185). It interprets major repairs as carrying out a set of works provided for by law to eliminate faults in worn-out or deteriorated structural elements of the common property of apartment buildings.

The methodological document developed for workers of public utilities and management companies (MDK-2-04.2004) directly indicates the work that is carried out during major repairs at the expense of management companies. This is, first of all, work related to the restoration of external elements of the facade, roofing work, work to replace utilities (hot and cold water supply risers, sewerage, heat and gas supply), and electrical networks. It should be noted that this provision guarantees the tenant the replacement of all of the above elements up to the first (shut-off) valve if the apartment is privately owned. The exception is heating and gas supply risers. Here the work is being carried out in full. For those who live in municipal housing, repairs to replace communications and other work performed during major repairs are carried out as planned at the expense of the management company. We are not interested in this category now, since we are planning to equip our own housing on our own and at the expense of our own capabilities.

Major apartment renovation: concept and basics

So, you should remember that the concept of a major apartment renovation for you includes:

  1. Continuous alignment of walls and ceilings
  2. Partial or complete replacement of floor structures
  3. Replacement of internal water and sewer networks
  4. Replacement of entrance and interior doors
  5. Laying new electrical networks with possible replacement of metering devices
  6. Replacement or tiling of walls and floors
  7. Replacement of plumbing fixtures
  8. Forced exhaust ventilation device
  9. Window replacement
  10. Changing the stylistic solutions of the apartment space (redevelopment, adding decorative elements).

Cosmetic repairs, unlike major repairs, change only the appearance of structures without replacing structural elements. This includes:

  1. Replacement of floor covering
  2. Wallpapering walls or painting over existing surfaces
  3. Ceiling painting
  4. Painting windows and doors
  5. Painting of hot and cold water supply risers
  6. Painting of heating pipes and radiators (convectors).

Before you start renovating, you need to determine what you want to get after its completion. If during the work you are planning a partial or complete redevelopment of the internal space, you cannot do without a package of permits. The process is quite long and expensive. It must be taken into account that redevelopment affecting load-bearing walls or frame elements is prohibited. Therefore, decide whether you need to go through the troublesome and costly procedure of obtaining permission in order to move the interior partition a few centimeters. It might be worth looking for a different architectural solution.

The next step will be to draw up a plan for the work that you have decided to carry out. If there is no need to replace all communications, then you should at least take into account that the hot water supply, hot water supply and heating risers passing through your apartment are most likely the same age as the building, and therefore must also be replaced. The law, as we found out, says that this is the job of the management company. But when you go there, you may hear in response that your house is in...... eleventh place in the plan for major repairs. It’s still worth doing the work of replacing the risers - this will protect you in the future, after you’ve finished everything, from unexpected emergencies in the renovated apartment. You should also obtain the consent of the neighbors living above and below your apartment, and have all pipe joints made by them: this is necessary so that not a single section of old pipes ends up in the ceiling and does not cause difficulties when eliminating leaks. Agree, it would be a shame to end up with a leaking ceiling and peeling tiles because of the saved 30-40 cm of pipe remaining in the ceiling.

The same fully applies to electrical work. The wiring needs to be changed not only in the apartment, but also in the entrance, right down to the electrical distribution board. This is due to the fact that often in houses, even relatively recently built ones, wiring was used that was not designed for the increased loads in the apartment. You may have to replace the electric meter if the previous one is rated at 5-10A.

Major renovation of an apartment: stages of work

Have you gone through all the stages and are ready to begin a major renovation of your apartment, but don’t know where to start? I will try to list an approximate sequence of work.

  1. Preparing the work site. It includes emptying rooms of interior items and de-energizing the room. When carrying out room-by-room repairs, it is necessary to route all the wires into the corridor so that each room can be connected temporarily when the repairs in it are completed.
  2. Dismantling pipes and heating risers (if necessary). Before you start, you need to make sure that there is no water in the heating system and that the cold and hot water supply risers are securely shut off.
  3. Installation of a heating system with installation of taps in front of radiators and installation of internal cold and hot water supply networks.
  4. Removing old wallpaper and dismantling flooring and flooring.
  5. Installation of new electrical wiring.
  6. Leveling the walls, which means plastering them or covering them with sheets of plasterboard. It is necessary to mark the locations of hidden communications on the room plan or take photographs of the walls, so that later you do not remember where the wire or heating pipe runs. At the same time, you can carry out work on tiling the walls in the bathrooms and kitchen.
  7. Work to correct ceiling defects, if you decide to make a ceiling from plasterboard or simply level it with a gypsum-based plaster compound. If it is planned to install a stretch ceiling, then this work must be carried out after all repair work has been completed.
  8. Puttying walls and ceilings, followed by cleaning the surface with sandpaper and priming with penetrating compounds.
  9. Installation of subfloors and tiling in bathrooms.
  10. Installation of new plumbing fixtures.
  11. Replacement of windows and doors with repair of slopes.
  12. Ceiling painting.
  13. Wallpapering walls or painting them with water-dispersion compounds.
  14. Floor covering.
  15. Installation of baseboards and trim on doors.

That's it, the renovation is complete. All that remains is to install heating radiators and electrical appliances and enjoy the results of a major renovation of the apartment, but remember that the renovation cannot be completed - it can only be suspended.

From this article you will learn:

  • What is the difference between a major renovation of an apartment and a current one?
  • What are the benefits of a major renovation?
  • How to choose a company that will carry out high-quality turnkey renovations of apartments
  • How to organize a turnkey overhaul of apartments
  • What kind of work does a major renovation of an apartment include?
  • What determines the price of a major renovation of an apartment?

Everyone knows that renovation in Moscow is an effective way to resolve issues such as investing accumulated funds, changing the design of an apartment, or lack of constant employment during the day. There are several types of repairs, which differ based on the scale of the home improvement work performed, for example, a major turnkey renovation of an apartment.

What is the difference between current and major renovation of turnkey apartments?

A major renovation of an apartment is a difficult task, but once completed, you will enjoy the results for many years. In the process of a major overhaul, it is possible to update communications and structures that have worn out over time and, in addition, change the design of the apartment beyond recognition.

It is recommended to carry out such repairs every 15–20 years.

Current apartment renovations make it possible to significantly transform your home without updating communications.

In addition to the above types, there are cosmetic and European-quality repairs.

Cosmetic renovation is an excellent option for updating the exterior of your home, allowing you to bring something new into your life. This type of repair consists of updating floor, wall and ceiling coverings. In most cases, it is carried out at intervals of 5–7 years to maintain a cozy atmosphere and decent appearance in the home.

European-quality renovation – renovation using modern materials and technologies. This type of renovation includes the installation of underfloor heating (warm floors), equipping the apartment with a water filtration system and Smart Home electronic control.

A clear understanding of the subtleties and nuances of repairs will be useful not only to show your erudition. The ability to distinguish between types of repairs will certainly help if hired workers are used. Considering that a turnkey overhaul of an apartment is much larger than the current one, its implementation will require much more financial costs. So it turns out that knowledge and understanding of all aspects of apartment renovation will help to avoid unnecessary losses of time and money.

What are the advantages of a turnkey apartment renovation?

The biggest advantage of a major renovation is the opportunity not only to update the appearance of the apartment, but also to eliminate wear and tear on internal structures, floors, partitions, pipes, etc.

In the 80s, due to a shortage of qualified repairmen, a lack of materials and a low level of technology development, major renovations of apartments were carried out very rarely. And cosmetic repairs were usually carried out through joint family efforts. In most cases, only minor deficiencies in the room that affected its appearance were eliminated.

At the moment the situation has changed. The service market offers a wide selection of specialized apartment renovation companies with qualified personnel. Technologies and materials have come a long way. Thanks to this progress, a high-quality overhaul can radically change even a very dilapidated apartment.

Properly done major repairs will last a long time. If after a few years you want to make a new apartment design, you can limit yourself to changing the external finish of the floors, walls and ceiling.

Before starting repairs, the question always arises: to carry out all the work yourself or to involve qualified employees. It is unlikely that you will be able to carry out such work with your own hands, without knowledge and skills in plumbing, finishing and other types of repair-related areas.

If you strive to achieve the best result in the shortest possible time, then you need to order a turnkey overhaul of your apartment from professionals in their field. This option is chosen by most apartment owners.

If you lack funds to hire specialists, have a lot of free time and are inclined to do the work yourself, of course, there is the option of doing the repairs yourself. However, if you choose this path, be prepared for a complex and time-consuming process, as well as errors and rework.

Often, having undertaken a major renovation of an apartment on their own, owners realize that turning to professionals would be the right decision.

How to choose a company that will perform high-quality turnkey apartment renovations

Naturally, you should not choose a company for apartment renovation based only on the cost of the services provided. Only qualified specialists with deep and extensive knowledge of their business will fulfill your wishes in terms of repairs at a high level. Obviously, such masters will not work “for three kopecks.” It is worth understanding that the cost of renovating an apartment also depends on the cost of materials. To avoid getting into trouble, you need to carefully select hired workers and take into account the following points:

  1. Good specialists have a demand for their services. In rare cases, they will be able to begin repairs right away. Most likely, your repair will begin only after they have completed all previously taken orders.
  2. Highly trained and experienced renovators can show you their previous work. It’s even better to ask your friends if they know specialists whose services they have already used and were satisfied with.
  3. The best choice would be an officially registered company that has all the necessary licenses. With her you will draw up an agreement and receive a guarantee for the completed work for a period of at least one year
  4. The range of services provided by selected specialists is also important: from the process of purchasing materials to checking the activities of subcontractors.
  5. It is necessary to draw up the most detailed estimate and work schedule.
  6. You should be informed of the actual deadlines for completing the work. Typically, a major renovation of an apartment with an area of ​​100 sq.m takes at least 5-6 months. (3-4 employees), and with an area of ​​50 sq.m - approximately 4 months.

How to organize a turnkey overhaul of apartments: 2 options

Living in housing under renovation causes many inconveniences. Plastering work, screeding floors, dismantling walls and other work are certainly associated with dirt and noise. As a result, the question arises of how best to carry out the repair. There are two ways:

  1. Carry out apartment renovations in parts and live in rooms that are not currently being renovated. In this case, the time required for repair work will be greatly delayed. The lack of comfort, multiplied by dirt and constant noise, will stretch this time to infinity.
  2. Renovate the entire apartment at once. You will have to temporarily move to another apartment and vacate the premises as much as possible (if possible, take them out, and fold the rest compactly). In a vacated apartment, work completion time is reduced by eliminating the need to wait. The pause time, associated, for example, with the drying of the applied materials, can be used for work in other rooms.

How to prepare for a turnkey apartment renovation

When the time for renovation work is about to come and it is decided to do a complete turnkey overhaul of the apartment, you need to find housing for a while. It is necessary to remove all things from the premises as much as possible so that everything remains intact and does not interfere with the repair.

You also need to make several copies of the keys to the front door: for the foreman and the worker. Sometimes you can install additional ones, such as padlocks.

Among other things, you will need a temporary place to store garbage bags. Housing maintenance organizations often vigilantly monitor the cleanliness of the assigned territory, so ensure timely garbage removal. It’s better not to quarrel with the housing office; most likely, you will often have to communicate (for example, to turn off the heating or water supply).

Exchange contacts with the foreman and workers. Most likely, all issues related to the organization of work or the technical component will be resolved with an engineer and technical worker.

When arranging a meeting in an apartment with representatives of subcontracting companies (window and air conditioner installers, furniture assemblers, etc.), be sure to call a foreman. If turnkey apartment renovation is a design project, then invite him too.

In order to be aware of the progress of work in your apartment, the delivery of materials and various cargo, as well as to have timely access for subcontractors, it is necessary to work out and approve a work schedule. You must be sure that people work in the apartment, for example, on weekdays from 10:00 to 18:00.

In order not to enter into conflicts with other residents, you need to think about them. According to Law No. 52-FZ, noisy repair work is permitted on weekdays from 9 a.m. to 9 p.m. with a break from 1 p.m. to 3 p.m. Repairs are prohibited on weekends and holidays. In certain regions of the Russian Federation, these requirements may differ.

The issue of cleaning the entrance will become relevant. Storing building materials and construction waste in the entrance is unacceptable. Most repairmen systematically restore order, especially on days when waste is removed or construction materials arrive.

If a turnkey apartment renovation is carried out in an old house, then the issue of changing the heating risers, water supply and sewerage will become especially acute. In order not to leave old pipes in the ceilings (the most vulnerable place), you can agree with the residents above, below (rarely on the floor) to replace worn-out communications to their apartments.

It is a little more difficult for residents of the topmost floor to prepare for repairs, since they will have to additionally inspect the roof (check for leaks) and pipes on the technical floor. In some cases, it may be necessary to replace the loose ceiling insulation in the attic.

Before starting work, you should take care of the meters (water meter, gas, electric). All metering devices are sealed and must remain intact during work in the apartment. Please draw the attention of the contractor's representative to the need to manufacture and install protective covers on the housings. There is a high probability that in order to continue installing communications you will need to remove the seals from the meters. To avoid troubles, contact a specialized organization to carry out work in accordance with all rules and regulations.

To obtain permits for redevelopment or changes in water supply, gas and heating networks, coordination with the relevant organizations will be required. The process of drawing up new contracts, conducting examinations and connecting will take a lot of time (usually 2 - 3 months), so it would be wise to do this in advance.

Major renovation of turnkey apartments in stages

Dismantling

In order for the renovation to please you for a long time, every qualified worker will advise you to dismantle all the old finishing down to the load-bearing foundations. Even if the existing finish is in good condition, you will have to remove it; it is unwise to apply new layers to it. Previously plastered walls can be left unchanged in cases where such a wall is covered with plasterboard.

The water supply, sewerage and heating systems must be replaced in any case. Considering the high cost of major apartment renovations, do not screw yourself by leaving old communications in the floor or walls. It is more reasonable to conduct new utility networks through the interfloor ceiling. In this case, the pipes and wires will be covered with a layer of finishing (plaster, drywall).

Another nuance will be the partitions. Even if you decide to leave the existing layout of the apartment, experienced craftsmen advise installing new partitions. This mainly concerns the toilet, bathroom and kitchen, since many utility networks are installed inside the walls of these rooms. The partitions of these rooms must be perfectly level with angles of 90 degrees relative to each other, otherwise you risk getting visual defects (when laying tiles or installing furniture). In almost one hundred percent of cases, it will be more economical to install an ideal partition from scratch than to try to “resurrect” an existing one. This is exactly the case when the stingy pays twice.

Change of layout

The installation of partitions begins immediately after dismantling is completed and is made from all kinds of blocks, bricks and drywall. There are pros and cons to using each material, but in general, any of them will do.

Network engineering

Often, utility networks are laid at this stage of repair. There is another popular option - gating plastered walls. In this case, the wires will not interfere with finishing work and will not be damaged during plastering.

The most reasonable choice for laying utility lines would be the ceiling or floor; running communications along the walls is not so reasonable. First of all, they install the sewer system, because a slope is required for its operation. In order to install a heating system at a high level, you need to put the radiators in place for a while and take into account the thickness of all layers of finishing.

The time has come to invite specialists to install air conditioning systems, who will lay drainage, power wires and interconnect cables. External air conditioning units are also installed. The indoor unit of the split system is installed after finishing work is completed.

After completing the installation of utility networks, test them. Voltage is applied to the electrical network and the presence of current at all “ends” is checked; fuses and emergency switches are also diagnosed. The water supply and heating systems are pressurized with air or water is supplied to the network and checked for leaks.

It is advisable to create a diagram of all utility networks, and it is better to photograph everything.

Window

Upon completion of dismantling, you need to install window blocks. Slopes, window sills and drains are installed after rough finishing, when the geometry of the rooms is clearly visible. Slopes are not plastered, otherwise these places will freeze in the cold season. It is better to use materials that make it possible to insulate problem areas, for example, a sandwich panel or moisture-resistant drywall.

Rough finish

For plastering, it is optimal to use gypsum mixtures; work is carried out using beacons. Most often, the walls are simply aligned in a vertical plane, but for bathrooms, toilets and kitchens, it is imperative to make all the corners straight (90 degrees). You can also plaster the ceiling, but this is an extremely complex technology with a lot of restrictions, and besides, it costs a lot of money. Remember that there should be no beacons left in the plaster layer.

When covering walls with plasterboard, a metal frame is used or the material is fixed with glue, thereby saving room space. To cover the ceiling, you will need to install a subsystem. If you have suspended ceilings, then most often they are installed after finishing the apartment.

The floor screed is poured room by room, but in all rooms at once. Everywhere they adhere to the same level, but there are cases when in the toilet and bathroom it is made a little lower (to prevent potential flooding of the apartment).

Local waterproofing of floors is also carried out (the area of ​​close attention is the holes for risers). It would not be superfluous to waterproof the kitchen.

A screed reinforced with rods or mesh will be of better quality. On all sides in the rooms it is necessary to lay foam material about one centimeter thick, which will separate the screed from the walls.

Having finished pouring the screed, it is checked according to the rule, rubbed down and protected from rapid drying by covering it with polyethylene. If it is too hot, the screed must be moistened periodically. With the help of self-leveling mixtures, the floor can be made immaculate.

Applying primer to surfaces is a very important “invisible” component of every repair. Walls, ceilings and floors can be primed many times (for example, before plastering or painting the room). You should not spare money on priming (sometimes owners cross it out of the estimate), just monitor the quality of this type of work.

Entrance door

The most convenient time to install the front door is after the floor has been screeded: the wet work is completed, the floor level is clearly visible. To prevent the parts of your (metal) door from being damaged, it is recommended to replace the door handles with inexpensive ones and dismantle the finishing panels. Considering the fact that builders have keys, use reprogrammable locks (after changing the set of keys), this way you can protect yourself from possible “duplicates”.

Ventilation

Upon completion of a major renovation of an apartment, in most cases the air circulation process deteriorates, humidity increases and window panes fog up (this occurs due to the use of sealed materials and the installation of fans in ventilation ducts). To supply fresh air, supply valves are used, installed in external walls or window structures. Therefore, for better air circulation throughout the apartment, interior doors are mounted at a short distance from the floor (usually 1-2 cm). For maximum efficiency, a device with a humidity sensor and timer is installed in the ventilation duct.

Balcony

If the redevelopment project involves combining a balcony with a living room, it must be well insulated. When choosing window frames, it is better to choose 2-chamber energy-saving double-glazed windows. The profile of the window frame should be 5 or 6 chambers, with a frame thickness of at least 7 cm. In cases where the balcony is not combined with rooms, you can slightly reduce the requirements for materials for its glazing, for example, use aluminum frames.

Finishing work

The putty is applied after the plaster layer has completely dried (approximately 14 days). Also, before filling, you need to finish working with the gypsum board. The putty is applied in several passes (installation of perforated corners, work with seams, direct application to the surface and sanding). To prevent downtime for specialists, prepare several areas of the apartment for work in advance.

To install tiles, especially mosaic ones, you need the highest quality prepared wall. Plaster the surface under the tiles using beacons. Often the plaster is also rubbed down. The tile fits very well on moisture-resistant plasterboard sheets. It is important to keep in mind that you need to fill the gaps between the sheets with tile adhesive. First, the wall tiles are installed from the second row, then the floor surface is laid with tiles, and only after that the missing first row is installed on the wall (as practice shows, you will need to cut 2–3 cm from the tiles).

It is extremely important to understand how and when seams are rubbed. There is no need to rush here, especially if we are talking about a floor surface; it would be wiser to perform this operation later, given that there is still plenty of dust and construction debris, and covering the tiles with oilcloth can only worsen the situation, since they often tear. It is much better to grout the joints at the final stage of repair, having first cleared them of debris and dust.

To properly cover the walls, be sure to apply a special primer and not wallpaper glue. The room must be perfectly clean. In cases where ceiling molding is used, it is glued, puttyed and painted.

Applying paint to putty is the most capricious job; unsatisfactory results can occur even when using a spray gun. For a perfectly smooth surface, a smooth interlining is glued on, which is subsequently also painted.

Wallpapering and applying paint significantly increase the humidity of the apartment, so only after these types of work are completed does the final finishing of the floors begin. Laminate is an extremely sensitive material to high humidity. To install floating floors (laminate, parquet boards, prefabricated cork), a base of 1 square meter is first prepared. m of such floor coverings, a difference of no more than 1 mm is allowed. In theory, it is possible to install the flooring without a single seam, but many experts prefer to separate it room by room, covering the joints with transition strips.

The doors are mounted above the finishing floor. In the case where the width of the door is less than the thickness of the partition, the difference is leveled out with extensions and extensions.

Having completed the door installation work, they begin to install the casings. Later, skirting boards are added, fixed with fasteners or glued to the partitions.

Now you can connect lighting fixtures, install electrical sockets and switches, large household appliances (washing machines, dishwashers, heating boilers, refrigerators, etc.), complete work on the air conditioning system, and install and connect plumbing fixtures in the toilet and bathroom. Having completed all these steps, you can begin installing heating radiators, as well as finish work on the front door (replace the handles with permanent ones, reconfigure the locks).

How much does a turnkey apartment renovation cost, and what does the price depend on?

Costs consist of the cost of services and prices of materials. If we take as an example a turnkey overhaul of an apartment without any special frills, but done with high quality, then the ratio will be 1:1. The price of home renovation with many utility networks and the implementation of an original design project is significantly higher than conventional options, including due to increased costs for materials and higher fees for services provided. For clarity, let's try to calculate. So, reputable organizations and teams of craftsmen charge for their services from 7 to 12 thousand rubles per 1 sq.m of floor, we add rough materials - approximately 4-7 thousand.

To clearly understand how much funds need to be prepared, you should schedule a meeting at the site with a representative of the organization and ask for a detailed estimate of the work. If you hold several of these meetings, you will be able to compare the cost of services from different contractors. A company employee will diagnose the apartment (condition of load-bearing structures, suitability of main elements, height differences, etc.), and also identify and discuss a list of required work. After some time (usually 2-3 days), you will be provided with a ready-made estimate for your review. It will contain prices for several dozen main types of work, indicating prices per sq.m/linear meter, as well as the total cost of major repairs. As a bonus, you can also receive a list of materials with approximate prices and costs for delivery of materials and removal of construction waste.

It is important to understand that even with a voluminous estimate, the list of services may be incomplete. In this case, it is necessary to take into account the costs of paying subcontractors (door and window installers, furniture assemblers, etc.).

3 tips to ensure that your turnkey apartment renovation doesn’t take too long

Tip 1. From the very beginning of a major renovation of an apartment, it is necessary to be focused on the final result, however, do not forget that each operation must be performed with the highest possible quality.

Tip 3. It is worth controlling the pace of work so that the process does not drag on unnecessarily or, conversely, does not proceed too quickly (quality may suffer).

Tip 3. Competent design work is largely the key to success. You can keep the plan in mind and try not to deviate from it in practice, but the optimal solution would be to cooperate with a qualified apartment designer. This approach will allow you to see the end result and, if desired, change anything about it.

“Pitfalls” of a turnkey apartment renovation

When choosing a team of specialists to carry out a turnkey overhaul of an apartment, you may encounter some difficulties:

  • You can be sure of a good result only if the repairs are carried out by qualified craftsmen. Unfortunately, the demand for this type of service has led to the emergence of scammers who cannot and do not want to work efficiently.
  • If you contact a reputable company, be prepared to spend a lot of money.
  • It is worth discussing your wishes for repairs and design with a specialist in advance, so that no details will be missed.
  • Before you start developing schemes and repair plans, it is important to understand how much work you plan to do

Remember, when accepting a finished object, you should pay close attention to the serviceability of plumbing communications and electrical appliances, as well as compliance with your project. In addition, you need to make sure that all the work stated in the estimate has been carried out.

Cooperating with the “My Repair” Company is reliable and prestigious. The specialists working here are professionals of the highest level. The company "My Repair" operates throughout Moscow and the Moscow region.

The clients of the BlagoDat construction company are people who want to make a turnkey major renovation without unnecessary problems and headaches. When do people turn to us for help?

  • housing was purchased in a new building without finishing;
  • I bought an apartment on the secondary market and want to renovate it;
  • your home is dilapidated - the tiles are chipped, scuffs are visible on the floor, the wallpaper is faded in the sun, other problems are noticeable;
  • I want change and an improvement in the quality of life.

We do turnkey apartment renovations of any complexity. Our specialists even work with exclusive materials, use the most modern technologies, and have extensive experience and knowledge.

How does our company carry out major repairs?

You are only a few steps away from high-quality finishing of the room! We cooperate with clients according to the following scheme:

  1. We receive an application that does not oblige you to anything;
  2. We arrange a meeting and consultation;
  3. We take measurements and find out the client’s wishes;
  4. We draw up an estimate for major repairs and communicate the cost to you;
  5. If you are satisfied with everything, we conclude an agreement applying the current discounts;
  6. We draw up a design project, if necessary;
  7. We carry out work under careful control and supervision;
  8. We hand over the object, which is accepted by the customer.

By contacting us now, you will be able to receive high-quality repairs in the near future, the prices will be pleasant, and the result will be the same as you could only dream of!

What kind of work do we do?

We carry out work of any complexity, we do complex and partial finishing. The price per m2 of major repairs will include:

  • dismantling old communications and materials;
  • redevelopment in compliance with technical safety standards;
  • construction of walls, openings, installation of communications and systems;
  • installation of doors, windows, arches, stairs;
  • filling the floor screed;
  • alignment of walls and ceilings;
  • painting walls, wallpapering, laying tiles;
  • painting the ceiling, installing tension structures;
  • cleaning the premises after renovation.

All our work is carried out under the careful supervision of professionals - you will be confident in the quality, compliance with deadlines and your desires.

How much does a major renovation cost?

The price of work performed by our specialists depends on various parameters, but the average budget is:

  • for a 1-room apartment 33 sq.m. – from RUB 381,381;
  • for a 2-room apartment 42 sq.m. – from 485,394 rubles;
  • for a 3-room apartment 60 sq.m. – from 693,420 rubles;
  • for a 4-room apartment 73 sq.m. – from 843,661 rub.

We produce, the price of which is affordable. In addition, we constantly have promotions - when ordering a set of works you will receive a 15% discount.

Why do Muscovites want to do a major renovation of their apartment with us?

Our company BlagoDat is the leader in the finishing work market in Moscow, so contacting us is the right and rational decision. There are several advantages of cooperation:

  • We are customer-oriented, ready to adapt for your convenience;
  • we work according to the contract, observing all its clauses;
  • We provide free measurements and assessments;
  • the cost of major repairs is not excessive;
  • professionals work, careful control is carried out;
  • We carry out any work, including drawing up a design project.

By contacting us, you will receive high-quality, professional and inexpensive repairs with an individual approach to the client. Your home will be transformed, you will be satisfied with the result, because we are always happy to help people! Major repairs are not just the vocation of the BlagoDat construction company, but our real mission!

A major renovation involves not only finishing work aimed at improving the aesthetics of the premises, but also carrying out activities related to updating the complex of engineering systems, replacing carpentry and floor coverings, installing ceiling structures and, possibly, remodeling.

“Repair Prestige” has qualified specialists of various specialties who will carry out their work with impeccable quality, and the single responsibility system guarantees the client no defects and completion of repairs on time. Expensive? Nothing like this! We have professional tools, transport, the ability to purchase building materials at wholesale prices, thoughtful logistics and competent labor organization. The result is reasonable prices for all our services.

Calculator - calculating the cost of repair work

Price list for work during major repairs

Repair cost— from 5000 rub./m2

Name of capital works Unit Cost, rub.

Improved plastering of walls and partitions

m2 350 rub.

Improved ceiling plastering

m2 430 rub.

Ceiling putty

m2 290 rub.

Wall putty

m2 250 rub.

High quality ceiling painting

m2 220 rub.

High quality wall painting

m2 190 rub.

Pasting walls with plain and medium density wallpaper

m2 150 rub.

Wallpapering walls with thick and moisture-resistant wallpaper

m2 220 rub.

Installation of a single-level suspended ceiling made of gypsum plasterboard on a metal frame

m2 350 rub.

Installation of a suspended multi-level ceiling made of gypsum plasterboard on a metal frame

m2 400 rub.

Installation of suspended ceiling "Armstrong"

m2 310 rub.

Installation of rack and pinion stream

m2 360 rub.

Installation of single-layer gypsum plasterboard partitions

m2 430 rub.

Installation of 2-layer gypsum plasterboard partitions

m2 510 rub.

Installation of a single-leaf door block

dot RUB 2,500

Installation of a double-leaf door block

dot RUB 3,500

Installation of linoleum (dry)

m2 140 rub.

Installation of linoleum (with glue)

m2 190 rub.

Carpet installation (dry)

m2 175 rub.

Carpet installation (with glue)

m2 190 rub.

Installation of floors (laminate, boards)

m2 300 rub.

Sanding parquet floors

m2 360 rub.

*The approved estimate does not change after the conclusion of the contract, which is a definite advantage when working with us. That is, you will pay exactly as much as is calculated in the estimate.

Our portfolio

Our profile is QUALITY renovation of apartments, offices, cottages! You can see this for yourself by visiting the Portfolio section. We have created more than 30 photo reports and this is not the limit, our photo gallery is constantly updated.

Major repairs: our capabilities

As part of the overhaul, teams of qualified specialists under the guidance of experienced craftsmen will perform the following work:

  • Replacement of electrical wiring, installation of installation elements (switches, sockets, light sources);
  • Replacement of pipes in water supply, heating and sewerage systems, installation of water heaters, plumbing fixtures and heating radiators, installation of heated floors, installation of ventilation and climate systems;
  • Tiling works;

A major renovation of a cottage may be necessary both when purchasing a new home and one that has been in use for some time. New designs and finishes can lose their functions due to their construction with low-quality materials or failure to comply with technology.

In other cases, new owners may simply not like the layout of the house, the power of the installed heating system, or other issues that require a careful approach and huge investments. In old cottages, major repairs are required due to the physical demolition of all surfaces and utility networks.

Without performing certain operations in such a house, it is impossible to provide comfortable living conditions, which is what all owners of private real estate strive for.

What is the difference between a major overhaul and a cosmetic overhaul?

When ordering the company’s services, many clients wonder why they should pay extra money and choose cosmetic repairs. But this service has some differences. During major renovation work, craftsmen carry out redevelopment of premises, all types of rough and internal finishing, taking into account the wishes of the customer, arrange the necessary utility networks, and, if necessary, take on the design of the facade. But if you choose cosmetic repairs, you will not be able to achieve this.

The company's craftsmen will only correct some cladding defects, replace failed appliances or pipes, and take on the final finishing work. It is clear that you should not count on high quality in the absence of suitable rough surfaces and well-functioning communications.

List of work performed

When ordering such a service, the cottage owner can count on the following:

  • dismantling/installation of interior partitions;
  • installation of windows, doors;
  • arrangement of external and internal engineering networks;
  • replacement of plumbing fixtures;
  • installation of a heating system (including underfloor heating systems);
  • rough finishing of premises (plaster, putty, pouring screeds, etc.);
  • finishing of surfaces (wallpapering, painting, installation of laminate, tiles, etc.);
  • installation of lighting fixtures, sockets, switches;
  • garbage collection, etc.

How much will a high-quality turnkey renovation of a cottage in Moscow cost?

The cost of such a service for a cottage in Moscow is determined based on the operations performed and the type of materials used. Our craftsmen take all the necessary measurements in advance and, taking into account the customer’s wishes, prepare a detailed estimate. Approximate prices for the company's services are indicated in the price list.