Mora gas boiler. Mora Top - famous brand of boilers from the Czech Republic Heating boiler Mora


Device I. interior designhave Czech gas boilers Mora top made it possible to create heating equipment A new generation optimally relevant to European and domestic standards.

In the line of manufacturer Mora, hinged and outdoor units, which differ in various technical characteristics, the principle of work and productivity found place.

Description and characteristics of hinged equipment

Single-mounted and dual-circuit wall Czech gas boilers Mora Top have three basic modifications:


Single-mounted and double gas wall-mounted heating boiler Mora Top has a built-in programmer, a block with which you can set working program A few days ahead.

Overview of floor boilers Mora

Outdoor gas heating boilers Mora Top is presented in more than ten modifications, the main differences of which is the type of burner used and the heat chamber.

To increase productivity and heat transfer, it is recommended to use antifreeze. Heat exchanger I. internal organization Developed taking into account the use of this fluid as a coolant.

As practice shows, Czech water heating non-volatile floor flow gas boiler Mora Top is optimal decision For heating country houses. The lack of complex automation dependent on the electrical industry of nodes, high performance - all distinguishes the equipment of this series.

Conducting installation work

The Mora gas technique is thought out so that the installation and maintenance of boilers were as simple as possible and easy. All energy-dependent models have a self-diagnosis function. Information about all disorders is displayed on the LCD. Boilers are equipped with Mora equipment. As a result, automation, burner and other nodes provide stable and long-lasting operation.

Stacking and adjusting the boiler is performed as follows:

  • Energy-dependent boilers are included in the network. Automatically starts the self-diagnosis function. The controller checks the presence of pressure in the heating system and gas pipelines. When deviations are given a signal in the form of a digital value. After troubleshooting the boiler starts.
  • Non-volatile aggregates do not have a self-diagnosis function, an automatic ignition of flame, etc. Therefore, before the launch and commissioning of equipment, the representative of the company must make sure to comply with all the recommendations regarding the installation. The installation of the water treatment system and security group is obligatory, it may be necessary to connect an expansion tank and circulation pump.


Czech gas boilers Mora in general are launched without difficulties, but there are exceptions, mainly related to the disruption of transportation or installation.

One of the common faults of the two-kilt is the failure of the thermocouple. After replacing the performance of the equipment is completely returned.

Because of what it is worth buying the Mora brand boiler

In the boilers of Mora, there is something that other manufacturers are often missing - an understanding of the difficulties and features of work in domestic conditions. Potential buyer Also attracts the ability to choose a suitable model.

Huge presented the lineup: from 15 to 750 kW. You can pick up completely automatic installation And the classic boiler without the presence of a complex automation. Simple rules Operation also ensure the popularity of Czech models of Mora.

On page: 15 25 50 75 100

By default, the name (A -\u003e I) Name (I -\u003e A) Price (ascending) Price (descending) Rating (descending) Rating (ascending) Model (A -\u003e I) Model (I -\u003e A)

Mora.

ST10996.

2 389.00 p. ST10996. 01, 08. Rectifier of thrust (art. ST10996). On an explosive drawing Detail No. 01, 08. Suitable for: 5106.1032 Gas boiler, detail number 1. 5107.1032 Gas boiler, detail number 1. 5118.1032 TERMIT gas boiler, detail number 1. 5119.1032 TERMIT gas boiler, detail number 1. 5506.1032. Flowing water heater, Detail number 8 .. 01, 08. Rectifier of thrust (art. ST10996) Mora

Mora.

ST10995.

2 389.00 p. ST10995. 01, 08. Traction interrupter (art. ST10995). On an explosive drawing Detail No. 01, 08. Suitable for: 5111.1032 Gas boiler, detail number 1. 5110.1032 Gas boiler, detail number 1. 5122.1032 TERMIT gas boiler, detail number 1. 5123.1032 TERMIT gas boiler, detail number 1. 5510.1032 Flowing water heater, detail number 8. 55 .. http: //syt/image/cache/data/store/st5106m_1-120x120.jpg 01, 08. Traction breaker (art. ST10995) Mora

Mora.

ST54008.

47.00 r. ST54008. 01, 17. Ring O 16x3 (art. ST54008). On an explosive drawing Detail No. 01, 17. Suitable for: EK08SB.N020 Electra Light, detail number 1. Pk14sk.n052 Titan gas boiler, detail number 17 .. http: //syt/image/cache/data/store/light_1-120x120.jpg. 01, 17. Ring O 16x3 (Art. ST54008) Mora

Mora.

ST90142.

7 102.00 p. ST90142. 01. Closed combustion chamber (art. ST90142). On an explosive drawing Detail No. 01. Suitable for: 5109.1032 Gas boiler, detail number 1. 5108.1032 Gas boiler, detail number 1. 5120.1032 TERMIT gas boiler, detail number 1. 5121.1032 TERMIT gas boiler, detail number 1 .. http: //syt/image/cache/data/store/st5106m_1-120x120.jpg 01. Closed combustion chamber (art. ST90142) Mora

Mora.

ST90143.

6 573.00 p. ST90143. 01. Closed combustion chamber 5112,5113,5125 (art. ST90143). On an explosive drawing Detail No. 01. Suitable for: 5112.1032 Gas boiler, detail number 1. 5113.1032 Gas boiler, detail number 1. 5124.1032 TERMIT gas boiler, detail number 1. 5125.1032 TERMIT gas boiler, detail number 1 .. http: //syt/image/cache/data/store/st5108m_1-120x120.jpg 01. Closed combustion chamber 5112,5113,5125 (art. ST90143) Mora

Mora.

ST90023.

5 565.00 p. ST90023. 01. Camera combustion (art. ST90023). On an explosive drawing Detail No. 01. Suitable for: 5116.1032 Gas boiler, detail number 1. 5117.1032 Gas boiler, detail number 1 .. http: //syt/image/cache/data/store/st5108s_1-120x120.jpg 01. Camera combustion (art. ST90023) Mora

Mora.

ST90353.

78.00 r. ST90353. 01. Pan Small Clamp (art. ST90353). On an explosive drawing Detail No. 01. Suitable for: pk14sk.n052 Titan gas boiler, detail number 1. Vega10.n012 VEGA flowing water heater, detail number 1. Vega13.n012 VEGA flowing water heater, detail number 1. Vega16.n012 VEGA flow water heater, detail number 1. Vega10e.n .. http: //syt/image/cache/data/store/titan_1-120x120.jpg 01. Pan Small Clamp (Art. ST90353) Mora

Mora.

ST10380.

16 727.00 p. ST10380. 02, 07. Heat exchanger (art. ST10380). On an explosive drawing. Detail No. 02, 07. Suitable for: 5119.1032 TERMIT gas boiler, detail number 2. 5506.1032 Flowing water heater, detail number 7 .. http: //syt/image/cache/data/store/st5119_1-120x120.jpg 02, 07. Heat exchanger (art. ST10380) Mora

Mora.

ST10994.

19 103.00 R. ST10994. 02, 07. The heat exchanger is a welded part (art. ST10994). On an explosive drawing Detail No. 02, 07. Suitable for: 5111.1032 Gas boiler, detail number 2. 5110.1032 Gas boiler, detail number 2. 5112.1032 Gas boiler, detail number 2. 5113.1032 Gas boiler, detail number 2. 5122.1032 TERMIT gas boiler, detail number 2. 5123.103 .. http: //syt/image/cache/data/store/st5106m_1-120x120.jpg 02, 07. Heat exchanger - welded item (art. ST10994) Mora

Mora.

ST10988.

15 374.00 R. ST10988. 02. Heat exchanger (art. ST10988). On an explosive drawing Detail No. 02. Suitable for: 5106.1032 Gas boiler, detail number 2. 5107.1032 Gas boiler, detail number 2. 5109.1032 Gas boiler, detail number 2. 5108.1032 Gas boiler, detail number 2. 5118.1032 TERMIT gas boiler, detail number 2. 5120.1032 Gas boiler TERMIT, D .. http: //syt/image/cache/data/store/st5106m_1-120x120.jpg 02. Heat exchanger (art. ST10988) Mora

Mora.

ST90457.

17 609.00 R. ST90457. 02. Primary heat exchanger (art. ST90457). On an explosive drawing Detail No. 02. Suitable for: 5114.1032 Gas boiler, detail number 2. 5115.1032 Gas boiler, detail number 2. 5116.1032 Gas boiler, detail number 2. 5117.1032 Gas boiler, detail number 2 .. http: //syt/image/cache/data/store/st5106s_1-120x120.jpg 02. Primary heat exchanger (art. ST90457) Mora

Mora.

ST90303.

9 345.00 R. ST90303. 03. Burner 12 plates 5118,5120,5121 (art. ST90303). On an explosive drawing Detail No. 03. Suitable for: 5118.1032 TERMIT gas boiler, detail number 3. 5120.1032 TERMIT gas boiler, detail number 3. 5121.1032 TERMIT gas boiler, detail number 3 .. http: //syt/image/cache/data/store/st5118_1-120x120.jpg 03. Burner 12 plates 5118,5120,5121 (art. ST90303) Mora

Enterprise Mora Top S.R.O. It became known worldwide after the Moravia Group of Companies acquired it as a subsidiary. However, before this transaction, the products under the trademark Mora were supplied to the market in the volume of hundreds of thousands of copies.

By the way, the model called Meteor became a boiler that was first made abroad on the basis of a license agreement. At the beginning of the 20th century, the Soviet leadership posted a production facility in Petrograd.

Today, Mora Top is an independent enterprise that specializes in the production of modern heating equipment. The company's production facilities give it the opportunity to supply about 100 thousand water heaters and about 50 thousand boilers, which indicates a serious scale of business. And the quality and reliability of products is confirmed by the fact that a huge percentage of finished equipment is exported to European countries and the CIS countries, where it is especially popular.

Mora gas boiler is harmonious combination Gorgeous performance characteristics, among which high quality assembly, indisputable practicality and decent performance. These main advantages contribute to a stable growth in demand for Czech brand products.

Mora boilers perfectly come to operate in country houses and urban apartments. They have compact dimensions that allow you to install the unit at any convenient location. In addition, their efficiency is high enough and ranges from 90 to 94% depending on the model. At the same time, each unit of production supplied to the market under the MORA trademark is fully certified in accordance with European safety and quality requirements. The manufacturer's company carefully takes care of such parameters as durability and excellent machinery efficiency.

What are the boilers in the Mora Top line?

The Mora Top boiler depending on the model can function on liquefied gas or diesel fuel. Nevertheless, the manufacturer shares the entire range of products offered to two main classes by other signs - wall and floor units. Some models in the Top line are equipped with additional equipment, such as a built-in drive that allows you to use the boiler and for heating, and for DHW, which is very convenient.

Equip equipment with an open and closed combustion chamber. Models of the first type can only be installed in rooms with good ventilation, as the fence fresh air It is carried out directly in the place where the unit is located. Closed camera implies more complex design Boiler, but also more comfortable operation of technology. In such models, the systems of forced thrust are installed, which injected the air inside the system through special built-in fans.

main destination wall structures Brand Mora is a high-quality heating of small residential buildings and apartments, the area of \u200b\u200bwhich does not exceed 350 square meters. Constructions that are mounted on the wall differ in compactness. They have a built-in heat exchanger manufactured from high-quality copper, which is not terrible rust. Such a feature of the design makes it more wear-resistant and durable, which is very relevant in the Russian operating conditions.



Mora Top Meteor is one of the most common series of wall-mounted boilers, which will delight availability price and unpretentiousness during operation. In this case, none of the variations of Meteor is inferior by functionality more expensive aggregates.

Mora Top Meteor Plus is a model range that includes improved modifications of popular METEOR models. Boilers of this series are equipped with automation, which can be configured individually under a specific user. At the same time, the presence of an automated control unit makes the operation of the heating technology noticeably more reliable.

Mora Top Sirius is a ruler represented by the most "charged" and high-performance units, which provide for maximum additional options, such as automatic boiler power regulation. By innovation, the engineers of the Czech company managed to create a device with high efficiency and a minor level of fuel consumption.

Separately, it is worth saying about Sirius models, the main a distinctive feature which is simplicity and unpretentious design. In addition, these boilers are very economical and easily mounted.

Outdoor models of the Mora Series Top brand boilers are represented by high-performance and strikingly endless structures that easily withstand the aggressive climate of some northern regions of Russia. These aggregates have cast iron heat exchangers, which are not scary sharp temperatures and rust. A considerable advantage of Mora's outdoor boilers is that they are withstanding voltage drops without any problems. This is especially true in remote areas of our country.

Additional plus techniques of the Czech brand are almost silent work.

The manufacturer's company supplies the following floor heating boilers to the market:

  • Mora Top Classic - optimal choice for small houses With poor thermal insulation. When comparing the price and quality of this equipment, it can be concluded that the Classic model is the most attractive offer on the market.
  • Mora Top G - boilers created for regions that are characterized by interruptions in the supply of electricity. In addition, the type G models easily cope with low gas pressure in the system up to an indicator of 40 mbar.
  • Mora Top E - gas-melting equipment, equipped with automatic electrical ignition and modern system controlling the temperature of the coolant.
  • VL100-VL 750 models - first-class equipment equipped with a superior burner. In structures this type An additional ventilation system is established, which affects the noise level, published by the technique in the process.

Mora's boilers Top line - very reliable and easy to operate gas grinding equipment to which the manufacturing company distributes the annual guarantee. This once again confirms wonderful specifications aggregates.

The engineers of the Czech company took care of the safety of users with boilers, equipping them modern systems and fuses that prevent many problems, such as coolant overheating, drop pressure in the system, etc. With the correct installation of equipment and with a germ operation, the user can significantly delay the moment of the first breakdown, which can occur, after dozens of years. This is one of their main advantages.

Speaking about the boilers of this brand, it is worth mentioning their main advantages:

  • High performance with insignificant gas consumption;
  • Democratic price, both on the equipment itself and on components;
  • Advancement to work in complex climatic conditions;
  • Easy to control the boiler, which makes it easier to easily make everyday operation.

Russia, Moscow region, Krasnogorsk district, R.P. Nakhabino, ul. Soviet d. 86, office 106

Czech manufacturers deliver high-quality and reliable heat engineering to the market. One of the largest and famous companies In this segment - Mora-TOP. Firm produces wall, floor gas and electric boilers Heating, Water Heaters and Accessories. The company's products are exported to several countries of the world, has all the proper certificates, uses good demand in the market of heating equipment. This is high-quality economy-class products.

Mora-Top is founded in 2000. At that time, she was a subsidiary of Mora Moravia JSC. Three years later, the company became an independent manufacturer of heating and water Heating Equipment. Its products came to the domestic market, to the countries of the post-Soviet space, as well as to Poland, Romania, Slovakia and others.

The growing demand for the Mora-Top heating technique has become an excellent incentive for development. In 2004, the company's management began the construction of a new high-tech factory in the city of Destroy. Today, Mora-TOP production facilities is a big factory where it is installed. new equipment And more than 100 workers are involved. The quality of the manufactured technique is carefully controlled. The company takes care of the effect of production on the environment and uses everything available tools for protection ambient.

Assortment of heating equipment and accessories to it from Mora-TOP

In addition to heating boilers, Mora-Top produces water heaters and individual elements of heating systems. So, if desired, each buyer can improve the heating of the house by installing the desired regulators, turbocharges, burners, chims. To simplify the installation, the company offers sets of connecting tubes, seals and many other accessories.

Gas wall boilers

Mora-TOP technology is distinguished by high efficiency, applied in domestic and industrial systems Heating. The main advantage of the heating equipment of this company is a combination of a reasonable price and high quality. Models are equipped with open and closed combustion chambers. Special attention The manufacturer focuses on the safety of the operation of heat generators. Some models are equipped with turbochards, expansion tanks.

Electric heating equipment

Mora-Top electrocurceptors meet all the modern requirements for economy, environmental friendliness, reliability and convenience in operation. All models are capable of working in 10 different modes, provide rooms with heat and hot waterDifferent with stylish ergonomic design, easy to install. ELECTRA series models are particularly popular among buyers.

Outdoor heat generators with atmospheric burners

These boilers work on natural Gas. They are relatively inexpensive, qualitatively assembled, durable, perfectly suitable for household Systems Heating. Each model is adapted to complex operating conditions, no problems transfers pressure drops and can operate at low gas pressure in the pipeline.

Mora-TOP boilers successfully used in post-Soviet countries, where difficulties often arise with more "capricious" in relation to the operating conditions of technology european manufacturers. Classic models can be recommended for Russia: the optimal ratio of price-quality, adaptation to unstable work centralized Systems Gas supply.

    For three years, we use the two-door gas boiler Mora Top Meteor 18 kk. It is designed to be a room, up to 190 sq.m., so for our private house for 90 m.kv. Enough with your head. As just bought, there was a problem with some kind of thermostat and a boiler constantly Tuh. I had to replace the thermostat. But after that everything was improved and now the boiler works properly. Gas consumption depends on the weather, but generally quite economical. In winter, of course, the largest volume of gas is 180-200 cubic meters, and in the spring-autumn periods is significantly less - about 120-140. In the spring, when the nights are cold, and the day it is already warm, generally put the boiler for 1, and this is enough for a comfortable temperature in the house. It is convenient that the power is adjusted separately for heating and hot water. It works very quietly, sometimes even incomprehensible, and whether it works at all. For three years, we use the two-door gas boiler Mora Top Meteor 18 kk. It is designed to be a room, up to 190 sq.m., so for our private house for 90 m.kv. Enough with your head. As just bought, there was a problem with some kind of thermostat and a boiler constantly Tuh. I had to replace the thermostat. But after that everything was improved and now the boiler works properly. Gas consumption depends on the weather, but generally quite economical. In winter, of course, the largest volume of gas is 180-200 cubic meters, and in the spring-autumn periods is significantly less - about 120-140. In the spring, when the nights are cold, and the day it is warm, generally put the boiler for 1, and this is enough for a comfortable temperature in the house (+ 22-23 degrees). It is convenient that the power is adjusted separately for heating and hot water. It works very quietly, sometimes even peeking, it works or not. The big plus is that when the voltage jumps, the boiler does not swell. We have such jumps - a special phenomenon, especially in summer. The price of the model at the average level is not from the cheapest, but also far from expensive. At the same time, the quality quite justifies the cost.

    Already as a year I use this firm of boilers, I put myself a gas boiler Mora Top Vega 10.N012. At the moment I am very much saved compared to what was without him, in summer period I paid up to 2500 per month, winter to 4000. With this model of the boiler, the savings amounted to 30% of the amount, in some months it is up to 50%. It depends on the frequency of the use of the boiler, it creates an excellent environment in the house. My house is up to 160 sq.m and I will say that I have enough more than. At the expense of the size and capacity, quite compact, I would even say one of the most compact water heaters in the market. The columns are already included with the water duct 2.5 l / min., That I am very pleased.

    Three years ago, gas workers made an order to replace the gas column. The choice of a new column was not particularly bored, came to the store and bought Mora Top 13 with piezoejig. The purchased column works and up today without any problems. I think three years without emergency work, for such an aggregate - a great quality indicator. The column works constantly - the wick does not turn off. Sometimes, with a large draft, he swears until the column was new, the phytyl walked the first time, now since the fifth. When there are no one at home, and the wick flies, the automation works and the gas does not enable the room. When re-ignite, so that the thermocouple and the wick burned is steadily, the gas button must be kept 30 and not 10 seconds as written in the serviceport. Listed disadvantages I think it is impossible to attribute to the disadvantages of this column, it is rather "age sores". If you compare with the old column of the manufacturer of the Neva: the old column was not regulated, ignited by matches and was constantly broken. I'm completely pleased with the new column of Mora Top 13, and I do not regret the choice of this manufacturer.

    The year before last set themselves in the apartment Mora-Top Sirius. Apartment with an area of \u200b\u200b80 square meters and is well insulated outside, stand plastic windows etc. Fuel consumption for these 2.5 years we have 4,000 cubic meters of gas for heating and heating hot water, so I can boldly call the boiler economical and efficient.
    As advised in the store, we call the wizard every year for prophylactic cleaning from soot and dust, and so far there were no problems with work.
    Sometimes I would like to note the fact that sometimes very noisy inclusion in the winter, but the master reassured that most likely it is a gust of the wind blows into the chimney pipe, just during the ignition. It was also necessary to change all pipes and radiators before installing the boiler: instead of the old Soviet on more modern bimetalic.
    With the simultaneous turn on hot water in the bathroom, in the kitchen and working heating - there is no problem with heating and hot water Quickly reaching the mixer.
    In general, our family is pleased: the price, quality and savings on gas were justified by the replacement of the old on modern Mora-Top Sirius.

    This year, we finally ended the construction of the house at the cottages. And to stay even in the winter with the night, they decided to put the gas boiler. Immediately I decided to take high quality immediately. On the advice of a friend took the Mora SA 20 E. boiler. Has convenient managementEasy to use, even mother-in-law disassembled easily. It is very good. We are glad!

    8 years ago I bought me column Mora. Top VEGA 16 E with electronic ignition. For many years now I have even forgot about the problems with hot water and so on. No interruptions for the entire service life. High-quality column!

    We were looking for 15 kW gas outdoor boiler for a long time, in terms of its characteristics and cost, the gas floor boiler Mora SA 20 E was approached. It works almost silently, heats the apartment well, even in the coldest point of the apartment warm. The model in terms of gas is economical, and in its dimensions is small. Externally, the boiler looks good, in our interior he fits

Wall gas boiler Mora

Gas, flowing, thermal conductory boilers Mora, working on natural gas (or propane), are designed to flash premises with heat losses up to 10, 18, 23, 32 or 35 kW, and combined boilers are also designed to heat the waterproof water.

These boilers are wall. The removal of combustion products in some types of aggregates is performed outside the chimney, in some - through the wall using the fan.

Fig.2. Top part

Fig.3. Outdoor boiler with a tap of combustion products in chimney

Fig.4. Bottom part

Installation and joining wall boiler Mora

Fig.1. Dimensions gas boiler Mora 5118.

A - Water Heating - Distribution - G3 / 4 "
B - Economic Water - Removal - G1 / 2 "
C - Gas - G3 / 4 "
D - Economic Water - Sourning - G1 / 2 '
E - Water heating - Subject - G3 / 4 "

When installing the boiler, for its further safe and economical work, it is necessary to have a qualified project for a whole heating system.

Installation of the Mora gas boiler can only be performed by an authorized service organization.

For the unit, only the type of gas that is specified on the type of product shield can be used.

The installed and mounted unit cannot be moved to a new place.

Mora's boiler should be installed so that the socket for its electrical connection is located at an affordable place. The phase wire must be attached to the left sleeve, to the right - zero wire, Upper pin - grounding.

Failure to comply with this condition will lead to the fact that the flame of the burner after the ignition will go out.

Alarm thermostat, reverse thrust fuse, fan and pressure switch are under voltage 230 V. If you need to interfere with the data of the elements, you must definitely pull the plug from the power outlet.

The gas boiler is established in accordance with the projects for the heating system and on the gas supply of a residential building, utility household objects, production buildings etc.

If the heating system meets all the requirements for operation, safety and functionality, then the commissioning of the boiler can be carried out after the appropriate gas supply organization of the following documents to the appropriate gas supply organization: a project for the gas supply of the object, the act of readiness of the gas supply system, acts on the suitability of flue and ventilation channels.

Installing the gas boiler Mora on the wall

The device is designed for mounting on a wall made of non-combustible material.

Mora 5118 boiler installation can only be performed by an authorized service organization that has permission (license) to carry out these works.

The boiler can be installed in bathrooms, washbasins and shower, but we recommend it over the bathroom to install it at a distance, approximately 200 mm from the walls of the bath. Invalid installation of boiler outdoors.

To fulfill the rules fire safety It is necessary to observe the safe distance between the device and combustible materials: 100 mm - from the front wall of the boiler, 50 mm in other directions.

In order to access the functional parts of the boiler when maintaining, repairing or leaving, we recommend observing the following dimensions: 500 mm - from the front wall, 500 mm - from above (size minimally 200 mm must be saved to remove the skin), 300 mm - from the bottom.

There are no special requirements for the floor or coatings.

The boiler is attached to the wall with two screws or hangs on the bracket with two holes located on the frame of the boiler housing at a distance of 280 mm from each other.

An important circumstance when placing is the height of the room.

It is necessary to pay attention to the fact that the vertical size from the end of the upper damper of the thrust rectifier up to the middle of the chimney in the wall was at least 500 mm.

Connection of boilers with boding products

Mora's boilers are executed "Turbo" have a closed combustion chamber, suck the air for burning fuel from the outside. When installing there are no restrictions on the ventilation of the room.

The boiler can be installed using a set of connecting elements. Tubes included in the set of data of the connecting elements are made of of stainless steel And you can install them when installed on the connections panel.

The device is equipped with a fan. The execution of the allocation of combustion products and air supply can be doubled (coaxial) or two-pipe (separately supplying the air and the removal of combustion products).

Heating

Mora 5118 boiler will start working when receiving a signal from a room thermostat to reduce the temperature in heated rooms.

The pump and gas reinforcement will open up the flow of gas to the main burner. The heating water flows from the pump to the heat exchanger, where heats up and then enters the heating system.

The heating water temperature is recorded by the heating water temperature sensor. Heating water heating continues until the boiler is turned off when the desired temperature is reached in heated rooms.

Thus, the process is repeated until the boiler is attached to the power grid. The temperature of the heating water is set to the maximum value.

Water heating

The process of heating the economic water is priority before the heating process of water for the heating system.

The duct of water through the fuse of the drainage water duct introduces the boiler into the process of heating the economic water when the 3-chassing valve changes the direction of movement of the heating water, and it will pass through the secondary heat exchanger, and from there - back to the pump.

From heated heating water in a secondary heat exchanger in accordance with the temperature set by the user, economic water is heated.

Changing the power of the burner The electronics system maintains the temperature of the shop water at the selected level.

After graduating from the selection of warm economic water, the boiler will automatically rebuild on the heating process.

In the process of heating the economic water, the gas pressure entering the main burner changes so that the temperature of the economic water corresponds to the established, regardless of the fluctuation of the water flow under the influence of the fluctuation of the input pressure, i.e., the increased water consumption will cause an increase in gas pressure, and vice versa.

Safety of work

Safe work Gas boiler Mora provide the following elements:

Electronic control and control unit - electronic unit that provides and monitors activity individual elements Boiler (pump, thermostats, 3 chassis controlled valve, duct sensor, etc.).

The duct sensors of heating and economic water - will not be allowed ignition of the main burner with an insufficient water duct.

Thermostat emergency - closes the gas supply to the boiler when exceeding the maximum permissible temperature Water in the heat exchanger.

Reverse thrust fuse - if there is a clogging chimneys (Even partial), which will contribute to getting (leakage) products of combustion to the room, the reverse thrust fuse will register an increase in the temperature of the surrounding space and causes the closure of the gas supply to the main burner.

The boiler can be in operation again only after cooling the fuse, i.e., approximately, after 10 minutes by pressing the RESET button.

Pressure switch - If there is a clogging of the burning of combustion products (even partial), or the fuel burning will deteriorate (it will be lower than the installed norm) under the influence of a decrease in fan speed (voltage drop in the power grid), or the fan will not work, then due to the pressure switch it does not turn on boiler so that combustion products do not accumulate in closed chamber combustion.

A reverse thrust fuse or pressure switch must be functioning during the boiler operation and nothing should be influenced on their functions (for example, a change in position).

In the event of a re-disconnection of the reverse thrust or pressure switch, it is necessary to refer to the specialists of the authorized service organization to eliminate the malfunction and carrying out the work test.

Preparation for exploitation

When preparing a Mora's wall boiler to work, you must perform the following:

Control the water pressure in the heating system,
- open the windows and taps of the heating water (or economic water) - (valves under the boiler),
- Open the gas supply to the boiler.

Specialist of the service organization, when entering the boiler, obliged:

Control the pump mode - must be set to 3 level.

Run the start of the boiler.

Perform an ignition control:

Turn on the boiler with the button on control panels,
- After 5 seconds, the burner will light up from the spark series - ignition lasts 5 seconds,
- Ignition repeat 5 times.

Control the functions of the ionization electrode - to blow off the flame from the ionization electrode - after 3 seconds, the burner should go out.

Electronic boiler control will automatically go to ignition mode (another attempt to ignite the burner).

If burner ignition does not occur, the E2 malfunction code appears on the display - the flame loss. For ignition, you must click on the RESET button on the control panel.

Perform the burner control:

Control the main burner, the flame should only be around the weekends,
- Control the stability of the flame along the entire length of the burner plates.

Adjust the heating and initial power.

Malfunctions during the work of the Mora boilers

Error E0 is a temporary fault, a malfunction of the control unit and regulation is possible - call a service specialist.

ERROR E1 - lack of water (no water in the heating system or insufficient water duct) - monitor the heating system, radiators. Try to enable and turn off the boiler several times and turn off the boiler (in combined boilers).

ERROR E2 - shutdown of the boiler (for example, loss of flame control, disconnecting the reverse thrust fuse) - in boilers with a tap of combustion products into the chimney to control the permeability of combustion paths. Press the RESET button.

ERROR E3 - the heating water temperature sensor will open - call a service specialist.

ERROR E4 - the temperature sensor of the household water will open - call a service specialist.

Error E5 is a malfunction on the security module (ignition automation, excess of the maximum water temperature) - in boilers with a discharge of combustion products through the wall, check the passability of the tap of combustion products or air supply.

Control of Mora's boiler functions

When conducting an annual revision of the boiler, it is recommended to conduct periodic inspections for the performance of its functions.

Gas part - Check:

Functions of high-voltage electrical facilities with ionization fuse.

Ignition of the main burner.

Gas pressure on nozzles with: heating the heating water and waters, as well as at the initial, minimum and maximum capacity.

Folding the burner flame when the boiler is disconnected with a working or room thermostat, or manual disconnection, for example, when closing the duct of economic water.

Tightness of the compounds.

Reverse thrust fuse.

Heating of the heating water - check:

Pressure in the heating system.

Pressure in the expansion vessel (nitrogen).

The function of the 3-way controlled valve.

Pump - installation of pressure, noise control and tightness.

Filter at the entrance to the boiler.

The fuse of the heating water duct is the tightness of "0" -ller.

Tightness of the compounds (water).

Visual control of primary and secondary heat exchangers, cleaning of outer and internal surfaces.

Functions of the purge valve (on the pump).

Heating of household water - Check:

Fuses of the fuse of duct of economic water.

The quantitative dump of economic water, in which the fuse is triggered.

The tightness of "0" -ller.

Tightness of the compounds.

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

_______________________________________________________________________________